
Add to Cart
Automatic FruitJuice Filling And Packing Machine Apple Juice Filler Plastic Bottle Beverage Making Filling Production
The series equipment is used for bottle rinser and hot filling and sealing 3-in-1 unit machine for green tea, black tea, wulong tea and fruit juice and many milk drinks. And with only a few parts changed, the machine can also be used for mineral water or pure water drink filling.The machine integrates washing, filling, capping together. The design is scientific and reasonable. Its appearance is beautiful.Its operation and maintenance is convenient. The automation is high. It is good equipment for choosing hot drink filling machine.
Equipment Type | Automatic |
Bottle Type | PET round or square bottle Volume 200 - 2000ml Bottle diameter 50-115mm Bottle height 160-320mm |
Output | up to 32,000 bph |
Your product | Juice/Tea/non-gas wine drink and so on. |
Related Flow Chart:
SERVICE | |
1 | Warranty period is 12 months from the date of shipment. |
2 | After we receipt 30% advance deposit, we will start to produce. When the machine is completed, buyers come to observe and test machine by themselves, until the machine is running OK, we will arrange the shipment after the buyer pay for the other 70% balance. |
3 | The seller should supply the parts which is damaged non-contrived and is included in the standard configuration of this machine without any charges. The seller pay for freight in China, and the buyer should pay the freight out of China. |
4 | The seller will send technician to seller to maintain the machine within one week after receiving the visa to your company during the warranty period of this machine. |
5 | The seller should supply spare parts and service of maintenance to buyer out of warranty period, but the buyer should pay for the cost of parts and freight out of China and pay the roundtrip tickets between China and buyer, lodging and dinner, medical treatment, etc. |
6 | The buyer should get all conditions (raw material, water, power, compress air and tools) for installation and commissioning well before seller’s technician arrives at buyer’s factory. |
7 | The seller should supply buyer the documents for installation and commissioning within 5 days after contract is available, other related documents will be supplied to buyer before shipment. |
8 | The seller should send two or three technicians to buyer’s company make installation and commissioning of this machine. The time of installation and commissioning is 30 days from the date which seller’s technicians arrive at buyer’s factory and the seller prepare well all conditions for installation and commissioning. The buyer should pay for the charges of visa cost, roundtrip ticket, lodging, meal and Inland traffic to seller’s technician. And give each technician salary 100 USD one day. |
9 | The seller supply training service for buyer without any charges before shipment, and can train buyer’s technicians continuously when seller’s technicians install and adjust the machine. |